Beckett CF375 Manual de servicio

Busca en linea o descarga Manual de servicio para Calentadores De Agua Y Calderas Beckett CF375. Beckett CF375 Service manual Manual de usuario

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 29
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 0
INSTALLATION, OPERATING
and
SERVICE MANUAL
THE INSTALLATION OF THE UNIT SHALL BE IN ACCORDANCE WITH THE
REGULATIONS OF THE AUTHORITIES HAVING JURISDICTION.
OIL-FIRED BOILER
MODEL: NBR-3001
HEAD OFFICE
MARKETING / PRODUCTION
Newmac Mfg. Inc.
DEBERT AIR INDUSTRIAL PARK,
LANCASTER CRESCENT
P.O. BOX 9, DEBERT
NOVA SCOTIA, BOM 1G0
PHONE: 902-662-3840
FAX: 902-662-2581
WAREHOUSE
Newmac Mfg. Inc.
430 SPRINGBANK AVE., SOUTH
P.O. BOX 545
WOODSTOCK, ONTARIO
N4S 7Y5
PHONE: 519-539-6147
FAX: 519-539-0048
HOMEPAGE: newmacfurnaces.com
NOTICE TO HOMEOWNER:
READ THESE INSTRUCTIONS
SAVE THESE INSTRUCTIONS
2210293 REVISED DECEMBER 2006
Printed: ______________________
Vista de pagina 0
1 2 3 4 5 6 ... 28 29

Indice de contenidos

Pagina 1 - SERVICE MANUAL

INSTALLATION, OPERATINGandSERVICE MANUALTHE INSTALLATION OF THE UNIT SHALL BE IN ACCORDANCE WITH THEREGULATIONS OF THE AUTHORITIES HAVING JURISDICTION

Pagina 2

9BECKETT CF56KZ and CF56KY AIR TUBE COMBINATION / PARTSThe CF56KZ has an L1 S Turbulator. The CF56KY has a V1 turbulator. The air tubes and end conesa

Pagina 3 - BOILER INSTALLATION

10START-UP AND ADJUSTMENTSET-UP INSTRUMENTSThe installer must use a suitable draft gauge, smoke tester, carbon dioxide tester, 0-750 F stackthermomete

Pagina 4

11MAINTENANCE & SERVICEMaintenance and servicing must be done by a qualified burner technician or shortened boiler life and poorefficiency may res

Pagina 5

12FRONT ACCESS DOORWARRANTYThe following information is required to process warranty claims, owner’s name and address; serialnumber; model number; ins

Pagina 6

13FIGURE 8 (a) TYPICAL OIL TANK PIPING INSTALLATIONSFIGURE 8 (b) FLEXIBLE OIL LINE INSTALLATION

Pagina 7

14FIGURE 9 DIMENSIONS & CONTROL LOCATION

Pagina 8

15FIGURE 10 TYPICAL PIPING LAYOUTFIGURE 11 TYPICAL RADIANT FLOOR PIPING LAYOUT

Pagina 9

16FIGURE 12 STANDARD WIRING SCHEMATIC

Pagina 10

16FIGURE 13 NBR 3001 EXPLODED ASSEMBLY

Pagina 11

17TABLE 4 PARTS LISTItemPart No.Description1 A 5010059LC Standard Pressure Vessel Assembly (Less Coil)1 B CRN Pressure Vessel Assembly (Less Coil)2 A

Pagina 12

1NBR 3001 - GENERAL INSTRUCTIONSIt is the responsibility of the consignee of the unit to examine the packages for damage and, if found, to note the sa

Pagina 13

18FIGURE 14 RIELLO F-10 EXPLODED ASSEMBLY

Pagina 14

19TABLE 5 RIELLO 40 F-10 PARTS LISTPART NUMBERITEMRIELLO NEWMACDESCRIPTION1 3007234 Burner Back Cover2 3006992 Pipe Connector – Supply3 3006571 3/8” N

Pagina 15

20FIGURE 15 BECKETT CF 375 EXPLODED ASSEMBLYTABLE 6 BECKETT CF 375 PARTS LISTITEM BECKETT NEWMAC1 5877 2090024 Burner Housing Assembly2 3492 Air Band3

Pagina 16

21FIGURE 16 COMMON CHIMNEY DRAFT PROBLEMS

Pagina 17

22TROUBLESHOOTING CHARTPROBLEM CAUSE CORRECTIONBurner Motor Fails to Start Check for Broken WiresTighten ConnectionsClean ContactsThermostatReplace Th

Pagina 18

23TROUBLESHOOTING CHARTPROBLEMCAUSECORRECTIONNot Enough HeatFiring Rate Too LowUse Higher Input NozzleClean Heat ExchangerDirty Heat ExchangerFlush Bo

Pagina 19 - Description

24TROUBLESHOOTING CHARTPROBLEMCAUSECORRECTIONBurner Pump WhineSuction Line Air LeakTighten ConnectionsHydronic System NoiseProvide Free MovementInstal

Pagina 20

25IMPORTANT HOMEOWNER INSTRUCTIONS1. AN EMERGENCY POWER SWITCH IS REQUIRED TO BE INSTALLED IN ACONVENIENT LOCATION AT A SAFE DISTANCE FROM THE BURNER.

Pagina 21 - DESCRIPTION

26INSTALLER INFORMATIONNAME:COMPANY:INSTALLATION DATE:THE HOMEOWNER SHOULD TELEPHONE ( ) FOR SERVICE ORADDITIONAL INFORMATION.MODEL:1 FUEL INPUT (USGP

Pagina 22

27NBR (LIMITED) B0ILER WARRANTYEffective July 1, 1995 and subject to the following conditions Newmac Manufacturing Inc. warrants the Oil Fired BOILER,

Pagina 23

2BOILER INSTALLATIONINSTALLATION REGULATIONSThis unit should be installed in accordance with the regulations of the authority having jurisdiction. InC

Pagina 24 - TROUBLESHOOTING CHART

3PIPINGLocate the boiler as close as possible to the center of the heat distribution system and make sure the topis level. Typical Piping Layouts are

Pagina 25

4GAUGESThe pressure and temperature gauge supplied with the boiler has a 1/2” NPT connection. Refer to Figure9 for its location.TANKLESS DOMESTIC HOT

Pagina 26

5Differential Setting: This setting only effects the low limit operation. The circulator make and burner breaktemperature can be elevated by raising t

Pagina 27

6ZONE VALVESConventional zone valves operate in either a fully open or fully closed position. Most are normally closeduntil the thermostat calls for h

Pagina 28 - INSTALLER INFORMATION

7Fuel not heavier than No. 2 fuel oil must be used. The oil tank must be of an approved type--ULC labeledin Canada and ULI labeled in the United State

Pagina 29 - NBR (LIMITED) B0ILER WARRANTY

8Figure 4 shows a typical appliance installation. In this case there is a furnace and a water heater in anenclosed space--both require ventilation and

Comentarios a estos manuales

Sin comentarios